• 高速铁路通信工程施工技术规程(英文版)
21年品牌 40万+商家 超1.5亿件商品

高速铁路通信工程施工技术规程(英文版)

790 7.2折 1100 九五品

仅1件

浙江杭州
认证卖家担保交易快速发货售后保障

作者中国铁路总公司 编

出版社中国铁道出版社

出版时间2016-04

装帧其他

开本16开

定价1100元

上书时间2019-08-09

宏轩图书

八年老店
已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:九五品
商品描述
中国铁路总公司企业标准(Q/CR 9606-2015):高速铁路通信工程施工技术规程(英文版)

作者: 中国铁路总公司 编
出版社:  中国铁道出版社
出版时间:  2016-04
版次:  1
ISBN:  9787113213305
定价:  1100.00
装帧:  平装
开本:  16开
纸张:  胶版纸
页数:  160页
正文语种:  英语
内容简介:
  This specification is formulated to unify the technical requirements on the construction of high-speed railway commurucation system, reinforce construction management and ensure construction quality.

  This specification is applicable to the construction of high-speed railway communication system and shall be taken as reference in the construction of inter-city railway communication system.

  The construction of high-speed railway communication system shall be conducted in strict compliance with national laws and regulations, relevant technical standards, and design documents.

  In the construction of high-speed railway communication system, standardized management concerning the management system, staffing, on-site management. process control, etc. , shall be strengthened in order to realize the construction objectives related to quality, safety, construction period, investment performance, environmental protection and technology innovation*

  The construction of high-speed railway communication system shall feature mechanization, prefabrication, specialization and informati;ration

  The construction of high-speed railway communication system shall proceed in a disciplined manner.

  Risk management including risk plan, risk identification, risk assessment, risk evaluation and risk morutoring shall be well implemented according to the actual on-site situation, and special construction schemes and contingency plans shall be established at the same time.

  The construction of high-speed railway communication system which involves protection of cultural relics shall be carried'out in accordance with the related laws, regulations and the protective measures specified in design

  According to relevant national regulations and technical standardson resource conservation, energy saving and emission reduction, the technical scheme on energy saving and emission reduction for the construction of high-speed railway commurucation system shall be fonnulated and implemented with consideration of the actual engineering characteristics and construction environment.

  All staff involved in the construction of high-speed railway communication system shall receive necessary training and be qualified before taking up their post

  Relevant documents shall be collected and organized along with the construction of high-speed railway communication system, and be kept complete, accurate and authentic. And archiving shall be performed as required by relevant provisions.

  The main equipment and apparatus used in high-speed railway communication system shall comply with the relevant current national, industry and China Railway Corporation standards, as well as admittance regulations and design requirements.

  The position and instalLation of track-side equipment of high-speed railway communication system shall not intrude into the railway gauge.

   相关推荐   

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP