上海中心,作为中国一次自主建造高度超过600米的超高层建筑,上海中心是一项***的“超级工程”。Little Known Facts of Shanghai Tower(《智造密码》英文版)一书以数字为载体,从开篇至结束,通过“外观印象”“观摩体验”“地下探秘”“建造追问”“理念解码”5个篇章,99个密码点来实现对这幢建筑的精准解读。
【目录】
CHAPTER 01: APPEARANCE 632 m, Defining Shanghai's New Landmark 578,000 m2, The "Vertical Bund" 4 Times Deformation to a Dynamic "Body" "Time-Travelling" at a 120° Rotation Test Tracking: Wind Tunnel Tests with Total 120° Rotation 95° V-Shaped Groove, Defining Beginning and End Double-Skin Fagade to Save 50% on Energy Consumption Glass Skin Made by 20,357 Pieces of Glass Panels with Dynamic Smooth Design 150% Safety Factor to Avoid "Grass Rain" Test Tracking: Tests on Four Characteristics of Glass Curtain Walls Podium Building 38 m High with a "Dual Personatity" "Invisible Raincoat" Inside the 10 cm Interspace 12% Light Reftectivity: Transparent and Soft 135 F[oors of Setback, Composing the Externa[ Curtain Wait 21 Sky Gardens The Tallest Sky Garden with 380 m2 Wisterias in Half Garden, Vitality for 600 Years 1,817 Parking Spaces, Relieving Parking Jams 340-Meter-Long "Boulevard" Connects the "Golden Triangle" of Lujiazui 33% Green Coverage Rate: A Green Environment 26 Moss Balls Confirm Fresh Air 7,500 m2 Sky Garden A Trifecta of Color 132-Meter-Long "Ideational Landscape", A Mirror for Thought A "Fish Joy Painting" of 632 Colored Glaze Pieces A Museum at 173 m High 18,698 Optimum Crass Private Treasure Houses Groundbreaking Cloisonne Enamel, 1,789,653 Wire Inlays 1,000 Character Groups 2,000 m2 Space Sans Columns Atuminum Tubes, 1,989 m Long, A Dynamic Hair Inner Curtain War[ Intact at 960 ℃ Test Tracking: Fire Double-Sided Test at 1,000 ℃ Evacuating Personnel in 108 Minutes Foam Transportation Tubes, 620 m Long How to Ctean Grass Curtain Wails Covering 400,000 m2 Straight into the Air at 20.5 m/s Lifts Arriving in 35 Seconds 360° Vision without Occtusion 1,000 Tons of Damper, as Steady as Mount Tai 23-Meter-High Art Space: "Shanghai Smart Eye" 244 Loudspeakers, the "Holographic Sound"
CHAPTER 03: UNDERGROUND EXPLORATION Granite 288 m Underground A Home in the 9th Soil Layer Silent "Crossing" 86 m Underground 3,100 Tons, Ultimate Bearing Capacity Test Tracking: 3,100 Tons Limit Test 5 Steps of Piting, Precise Imptementation 1,079 Pile Foundations, Staggered Arrangement 40 Pressure Retief Wells for Confined Water 7 Pipe[ines in Road Reconstruction A Super-Large Foundation Pit with an Inner Diameter of 121m "Moving Ants" for 600,000 m3 of Soil 15,000 Tons of Steel Bars in 20 Days Pouring a Base of 60,000 m3 at Once Test Tracking: Actual Test of Concrete Ratio 5,630 Foundation Pit Guardians A Green Channel for Bearing More Than 500 kg/m2 9-Layer Cake Inspiration A 580-Meter-High Economic Core Tube 2° Tilt An 800 m2 "Aircraft" A3 m2 Aerial Platform How a 500-Ton Tower Crane Ctimbs 3 "Crescent Moon" Spacecrafts A 102-Layer "Bustte" 1,500 Connection Points Tugging on the "Outer Coat" Innovating 15 Specia[ Supports Test Track: Friction Coefficient Test of Special Bearings Saving 1,322 Horizontal and Vertical grip Supports 413 Sensors to Monitor Safety 18 "Dynamic Holes" Penetrate the Grass Curtain Watts 32 Doubte-Hanging Baskets Wearing the Buitding's Coat 4 "Eggbeater" Cranes AThin, Light Lift, with Bearing Capacity of 230 kg/m2 Pumping Concrete to 620 m High A 25 Fin-Shaped Truss "Light Crown" 10,733 Lights Aright a Tower's Crown
CHAPTER 05: DECODING GREEN CONCEPT BIM Efficiency, Saving at Least 100,000,000 Yuan Setting Up Green Benchmarks by using 43 Energy Saving Technotogies Green Procurement Radius of 500 km VAV Air Conditioner Saving 50% Energy Feedback Lifts with Power Conversion 30% Utitization Rate 24 Suntight Sensors Curtains Intet[igent Lighting "Ptants" 100,000 Trees Quiet Air Conditioning Reduces 15 Noisy Decibels 9 Sets of Transmission Pumps Inteltigent Savings for 245,994 m3 Rectaimed Water lO,340-Meter Pipeline Soit Capittaries 254 "Meter Readers" Controiting Water 90-Meter-Long "Anger Wings" Etiminate Atomization Two 110 kV Circuits Ensuring Safety 270 High Attitude Green Etectric Generators 2-Ways Guarantee, Mutua[ Backup 2 Energy Centers Realize Partition Energy Suppty Tri pie "Gas Hearts" Generate 12,800,000 kWh 3 Cooling Refrigerators to Transfer Energy 127 Ground Source Heat Pumps, Responsibte for the Perfect Exchange of Hot and Cord 2 CooiingTowers, Free Cord Source An "lntelligent Brain" of 200,000 Nerve Endings 10% Energy Saving by Best Energy Manager
以下为对购买帮助不大的评价