正版保障 假一赔十 可开发票
¥ 35.73 6.2折 ¥ 58 全新
库存9件
作者李新烽,邓延庭,张梦颖 著
出版社中国社会科学出版社
ISBN9787520330855
出版时间2017-04
装帧平装
开本其他
定价58元
货号9278189
上书时间2024-12-20
Introduction
Chapter 1 Origin of the Mombasa-Nairobi SGR Project
1.1 The Existing Meter Gauge Railways Failed to Meet the Transportation Demand
1.1.1 Colonial Struggles Gave Birth to the Meter Gauge Railway
1.1.2 Construction of the Existing Meter Gauge Railway
1.1.3 Operation of the Existing Meter Gauge Railway
1.2 The Need for Kenyan Social and Economic Development
1.2.1 Increase of Employment and Improvement of Laborers' Quality
1.2.2 Cracking the Bottleneck in Transportation
1.2.3 Accelerating Industrial Upgrading
1.3 The Result of the Integration of East Africa
1.3.1 Urgent Need for Interconnection in Railways among East African Countries
1.3.2 Games under the Geopolitical Pattern of East Africa
Chapter 2 Construction of the Mombasa-Nairobi SGR
2.1 Continuously Deepened Cooperation between China and Kenya
2.1.1 Kenya Has Geographical Advantage in Responding to China's Belt and Road Initiative
2.1.2 Sound Bilateral Ties between China and Kenya
2.2 China's Capital, Technology and Concepts Support Kenyan Railway Construction
2.2.1 Financing Cooperation between China and Kenya
2.2.2 Implementation of Chinese Technical Standards in Kenya
2.2.3 Ensuring the Kenyan Railway Quality with China's Whole Railway Industry Chain
— 没有更多了 —
以下为对购买帮助不大的评价