• 盾构隧道工程:从理论到实践:英文版:from theory to practice
21年品牌 40万+商家 超1.5亿件商品

盾构隧道工程:从理论到实践:英文版:from theory to practice

正版保障 假一赔十 可开发票

64.97 4.7折 138 全新

库存143件

广东广州
认证卖家担保交易快速发货售后保障

作者编者:王树英//傅金阳//张聪//阳军生|责编:刘颖维

出版社中南大学出版社

ISBN9787548746683

出版时间2022-01

装帧平装

开本16开

定价138元

货号11478204

上书时间2024-07-02

灵感书店

三年老店
已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
商品描述
目录
 Chapter 1 Overview of Research
  1.1  Concepts of shield tunnel engineering
  1.2  Types of shield machines
  1.3  Development history of shield machine and tunnelling method
  1.4  Development trend of shield tunnelling method
  1.5  Book organization
  References
  Exercises
Chapter 2 Geological Survey and Alignment Design for a Shield Tunnel Project
  2.1  Purposes of geological survey
  2.2  Geological survey contents and methods
  2.3  Evaluation of engineering geological conditions
  2.4  Cross-section and alignment design of shield tunnels
  2.5  Case study of a supplementary survey
  References
  Exercises
Chapter 3 Shield Machine Configurations and Working Principles
  3.1  Composition of the two main types of shield machines
  3.2  Concepts and functions of shield machine components
  3.3  Working principles of main shield machines
  3.4  Special shield machines
  References
  Exercises
Chapter 4 Shield Machine Selection
  4.1  Selection principles and methods of shield machines
  4.2  Selection of shield machine types
  4.3  Selections of shield machine configurations
  4.4  New technologies in the configuration of shield cutters
  4.5  Examples of shield machine selection in common strata
  References
  Exercises 
Chapter 5 Structure Type and Design of Shield Tunnel Lining
  5.1  Types and materials of shield tunnel lining
  5.2  Segment types and features
  5.3  Segments assembly and waterproofing
  5.4  Load calculation for shield tunnel
  5.5  Internal force calculation of segment lining
  5.6  Reinforcement and structure design of segments
  5.7  Connection tunnel design
  5.8  Seismic design of shield tunnel
  References
  Exercises 
Chapter 6 Launching and Receiving of Shield Machines
  6.1  Working shafts and ground improvement for shield machine tunnelling
  6.2  Configurations and technical controls for shield machine launching
  6.3  Configurations and technical controls for shield machine receiving
  6.4  Shield machine launching and receiving under special conditions
  References
  Exercises
Chapter 7 Shield Tunnelling and Segment Assembling
  7.1  EPB shield tunnelling technology
  7.2  Slurry shield tunnelling technology
  7.3  Segment transport and assembling
  7.4  Technologies for opening excavation chamber and replacing cutters
  7.5  Connection tunnels between two main tunnels
  7.6  Monitoring
  7.7  Construction techniques and case studies for shield tunnelling in special conditions
  References 
  Exercises 
Chapter 8 Backfill Grouting for Shield Tunnelling
  8.1  Introduction
  8.2  Backfill grouting materials and performance demands
  8.3  Common equipments for backfill grouting
  8.4  Backfill grouting construction and control for shield
  8.5  Backfill grouting process optimization technology and cases
  References
  Exercises
Chapter 9 Muck Conditioning for EPB Shield Tunnelling and Muck Recycling
  9.1  Reasons for muck conditioning
  9.2  Properties of the shield muck
  9.3  Types and technical parameters of soil-conditioning agents
  9.4  Soil conditioning systems
  9.5  Index properties and its determination method of conditioned soil
  9.6  Numerical simulation of shield tunnelling under soil conditioning
  9.7  Case study of muck conditioning for shield tunnelling
  9.8  Recycling of shield muck as resources
  9.9  Technical issues of muck conditioning
  References
  Exercises
 Chapter 10  Slurry Treatment for Shield Tunnelling and Waste Slurry Recycling
  10.1  General
  10.2  Shield slurry
  10.3  Slurry treatment site layout and equipments
  10.4  Case study on shield slurry treatment
  10.5  Recycling of waste slurry and case studies
  References
  Exercises
Chapter 11 Ground Deformation and Its Effects on the Environment
  11.1  Shield tunnelling induced ground deformation
  11.2  Ground loss in shield tunnel construction
  11.3  Prediction of ground deformation
  11.4  Assessment of the effects of shield tunnelling on existing buildings
  11.5  Common methods for ground deformation control
  References
  Exercises
Chapter 12 Defects of Shield Tunnel Lining and Their Treatments
  12.1  Common defect causes and control measures
  12.2  Investigation of defects in the shield tunnel segments
  12.3  Safety evaluation of the shield tunnel structure
  12.4  Defect treatment in the shield tunnel lining
  References
  Exercises 

精彩内容
     城市地层多为冲积、沉积作用形成,不可避免地,城市隧道多穿越黏土、砂土、上软下硬、强-全风化岩层等软弱地层,而且所处的周边环境异常复杂,所以城市隧道建造往往面临掘进难度大、环境干扰多、安全控制难等诸多难题。为了避免这些难题,由于盾构法施工相对安全快速经济,它已经成为软弱地层隧道建造的主要工法。
    盾构隧道工程所涉及的技术领域很广泛,本书比较全面系统地介绍了世界上盾构隧道工程的发展、勘察、盾构机构造及工作原理、隧道结构设计、盾构选型、盾构掘进与管片拼装、壁后注浆、盾构渣土改良及资源化再利用、盾构泥水处理、地层沉降及控制、运营管理与病害整治等内容。尤其在盾构机选型、复杂地层盾构掘进、渣土改良、壁后注浆等方面,结合技术发展现状,通过较多的典型工程案例进行了较为深入的介绍。

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP