This Specification is prepared with a view to unifying the technical standards of survey, design,construction and acceptance of shield rlway tunnels,and m the shield tunnel comply with the requirements of safety,reliability,advanced and proven technology,environmental protection, economical efficiency and reasonability.
  This Specification is applicable to the survey, design, construction and acceptance of new rlway tunnel constructed by shield method.
  Priority should be given to shield method when urban rlway tunnel or underwater rlway tunnel is to be built.
  The technical n for the design of shield rlway tunnel and the selection of shield type shall be determined according to the geology and landform of the site,the ecological environment,the energy supply condition and the equipment transportation condition etc. and by means of techno-economic comparison.
  Risk assessment focusing on environmental influence and construction safety shall be carried out in the design and construction of shield rlway tunnel.
  In the process of shield tunneling,the boring parameters shall be adjusted and the attitude of the shield shall be controlled according to the geological conditions and monitoring data so as to realize the dynamic management throughout the whole process.
  Technologies such as geology forecast and pre-reinforcement should be used in shield tunneling. When new technology,new techniques,new material and new equipment are used,relevant national and industry standards shall be complied with.
  During shield tunneling,the technical document of the project such as construction record, quality test report,inspection and acceptance record shall be filled out in time.
  In ition to this Specification, the survey, design, construction and acceptance of shield rlway tunnel shall also comply with relevant current national and industry standards.