1 general provisions 2 terms 3 raw material 3.1 rock 3.2 aggregate of high performance self-pacting concrete 3.3 cement 3.4 mineral admixture 3.5 chemical admixture 4 performance indices of rock-filled concrete 4.1 mix proportion of high performance self-pacting concrete 4.2 indices of self-pacting capacity 4.3 physical and mechanical indices of rock-filled concrete 5 design of dam 5.1 general requirements 5.2 dam structure 5.3 seepage control of dam body 5.4 temperature control and crack prevention 6 construction of rock-filled concrete 6.1 general requirements 6.2 preparation for cing concrete 6.3 quarrying, screening and cleaning rock 6.4 transporting and cing rock 6.5 ming and transporting high performance self-pacting concrete 6.6 pouring high performance self-pacting concrete 6.7 temperature control measures and curing of rock-filled concrete 7 quality inspection and control of rock-filled concrete 7.1 general requirements 7.2 inspection of raw material 7.3 quality control for cing rock 7.4 inspection of high performance self-pacting concrete 7.5 quality inspection and control of rock-filled concrete dam appendix a test method for mud content on rock surface appendix b test method for standard self-pacting mortar appendix c test methods for self-pacting capacity appendix d test methods for performance of rock-filled concrete appendix e onsite quality inspection methods for rock-filled concrete exnation of wor in this guide list of quoted standards
内容简介:
thi guide i formulated with a view to tandardizing the technology of rockfilled concrete dam to guide the deign and contruction of rockfilled concrete dam.
以下为对购买帮助不大的评价