• Dam Safety Monitoring Design
图书条目标准图
21年品牌 40万+商家 超1.5亿件商品

Dam Safety Monitoring Design

正版图书。概不议价!请勿催单!急单勿拍!!!套装书请咨询后再拍。小本生意,经营不易,喜欢申请违约金和退款的同行与书友请绕行

26.77 5.6折 48 全新

库存3件

湖南邵阳
认证卖家担保交易快速发货售后保障

作者赵志仁 著;任智锋、汤慧卿、李润芝、张宁、翁建平 译

出版社黄河水利出版社

出版时间2017-12

版次1

印数1千册

装帧平装

上书时间2024-06-12

一间温暖的书屋

已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
图书标准信息
  • 作者 赵志仁 著;任智锋、汤慧卿、李润芝、张宁、翁建平 译
  • 出版社 黄河水利出版社
  • 出版时间 2017-12
  • 版次 1
  • ISBN 9787550919280
  • 定价 48.00元
  • 装帧 平装
  • 开本 16开
  • 纸张 胶版纸
  • 页数 163页
  • 正文语种 简体中文,英语
【内容简介】
  The book introduces technical problems on dam security observation scientifically. For concrete dam, earth rock dam,bank of near dam region, water conveyance structure, and outlet structure, several plans, are resented. For example,observation item optimizing, test point optimizing, reasonable distribution, and facility selection. Moreover, the bookintroduces security observation designs of seven typical concrete dams and earth rock dams. Then, it shows evaluationof above designs. Based on past experience of dam security observation designs, advanced new technology and meansare generated. Of course, it has tight relationship with practical engineering. As a result, based on the principle(practical, reliable, advanced, economic), design is optimized. Purposes, such as damsecurity observation, gainingprofit, improving technology level of design and construction, could be achieved.
  The book is available for technicians of water resources and hydropower engineering design,construction,observation, scientific research, operation, management, facility production. Moreover, it could be used for staff ofuniversity as well.
【目录】
Chapter 1 Overview
1.1 General Principle
1.2 Observation Items
1.3 Limit Requirements

Chapter 2 Deformation Observation
2.1 Horizontal Displacement
2.2 Vertical Displacement
2.3 Deflection
2.4 Incline
2.5 Seam and Crack

Chapter 3 Seepage Monitoring
3.1 Uplift Pressure
3.2 Seepage Pressure
3.3 Pore Pressure
3.4 Bypass Seepage
3.5 Underground Water Elevation
3.6 Seepage Discharge
3.7 Water Quality Observation

Chapter 4 Stress Monitoring
4.1 Concrete Stress and Strain
4.2 Rock Stress and Strain
4.3 Steel Stress and Strain
4.4 Free Volume Strain
4.5 Soil Pressure
4.6 Temperature
4.7 Earthquake

Chapter 5 Hydrology and Hydraulics Monitoring
5.1 Water Level
5.2 Precipitation
5.3 Pressure
5.4 Energy Dissipation
5.5 Erosion and Deposition
5.6 Wave

Chapter 6 Automatic Monitoring
6.1 Basic Requirements
6.2 Designing Schemes
6.3 Monitoring System
6.4 Data Communication
6.5 Alarm Criterion

Chapter 7 Monitoring Instruments Graphic Symbols
7.1 Formulating Process
7.2 Formulating Principle
7.3 Instructions
7.4 Symbol Annotation

Chapter 8 Monitoring Design Instances
8.1 Concrete Dam
8.2 Earth and Fockfill Dam
8.3 Design Optimising
References
点击展开 点击收起

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP