• 深埋长隧洞TBM施工组织设计关键技术(英文版)
21年品牌 40万+商家 超1.5亿件商品

深埋长隧洞TBM施工组织设计关键技术(英文版)

全新正版 极速发货

29.93 5.0折 60 全新

库存6件

广东广州
认证卖家担保交易快速发货售后保障

作者洪松//孙宝升

出版社黄河水利出版社

ISBN9787550931848

出版时间2021-12

装帧平装

开本16开

定价60元

货号1202675223

上书时间2024-11-21

书香美美

已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
商品描述
目录
Translator′s Preface
Preface
Chapter 1  Layout and construction of TBM adit
  1.1  Layout of TBM adit
  1.2  Construction method of TBM adit
Chapter 2  TBM type selection
  2.1  TBM types
  2.2  Advantages and disadvantages of various types of TBM
  2.3  TBM host selection principle
  2.4  TBM host selection
  2.5  Introduction of TBM under development
Chapter 3  TBM configuration
  3.1  Open TBM configuration
  3.2  Single shield TBM configuration
  3.3  Double shield TBM configuration
  3.4  DSU-C
Chapter 4  TBM assembly, stepping sliding and launching
  4.1  TBM assembly
  4.2  Concept of TBM
stepping and sliding
  4.3  TBM launching
Chapter 5  TBM construction of deep buried long tunnel
  5.1  Tunnel TBM
construction
  5.2  Construction section of TBM through drilling and blasting method
  5.3  Maintenance and disassembly of TBM
Chapter 6  TBM construction and transportation
  6.1  TBM construction transportation object
  6.2  Tunnel slag
transportation
  6.3  Material transportation
  6.4  Train formation
  6.5  Locomotive configuration
Chapter 7Ventilation
  7.1  Ventilation standard
  7.2  Construction ventilation equipment
  7.3  Calculation parameters and
formulas of construction ventilation
  7.4  Construction ventilation calculation
Chapter 8   Cooling
  8.1  Ambient
temperature in tunnel
  8.2  Main heat sources for TBM construction of deep buried long tunnels
  8.3  Calculation of heat
in the tunnel
  8.4  Cooling measures in tunnel
  8.5  Cooling calculation model for TBM construction of deep buried long
tunnel
Chapter 9   Drainage
  9.1  Discharge forecast
  9.2  Design of TBM construction drainage system
Water hammer calculation
  9.4  Avoidance of water hammer
Chapter 10  Power supply
  10.1  Main power load
  10.2  Voltage
  10.3  Construction power supply load estimation
Chapter 11  Construction management of precast
concrete segment
  11.1  Scale of precast concrete segment plant
  11.2  Production process of precast concrete
segment
  11.3  Layout of precast concrete segment plant
Chapter 12  Countermeasures of TBM construction in unfavorable geologicalsection
  12.1  Main geological risks of deep buried long tunnels
  12.2  Measures to deal with main
geological risks of deep buried long tunnels
  12.3  Stuck treatment measures
Chapter 13  Schedule of TBM construction
  13.1  Scheduling principles
  13.2  TBM drilling feeler
  13.3  Other progress indicators
  13.4  TBM construction schedule preparation 197Reference

内容摘要
    This book systematically discusses some key technical problems in TBM construction planning of deep buried long tunnels. It not only shares the experience of practical work, but also introduces some new technologies and new achievements, to provide valuable information for readers.The book is divided into 13 chapters, including the layout of adits,TBM lectotype,configuration, assembly and departure, advancing,transportation, ventilation, cooling, drainage, power supply, precast concrete segment, solutions in unfavorable geological tunnel section and construction schedule for TBM construction.This book can be used as a reference for engineers and technicians in the field of underground engineering construction.

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP