• 黄河小浪底水库水文泥沙规律研究
  • 黄河小浪底水库水文泥沙规律研究
  • 黄河小浪底水库水文泥沙规律研究
21年品牌 40万+商家 超1.5亿件商品

黄河小浪底水库水文泥沙规律研究

全新正版 极速发货

34.8 5.1折 68 全新

库存2件

广东广州
认证卖家担保交易快速发货售后保障

作者李树森 等

出版社黄河水利出版社

ISBN9787550925618

出版时间2019-11

装帧平装

开本16开

定价68元

货号1202010925

上书时间2024-05-31

曲奇书店

已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
商品描述
目录
《黄河小浪底水库水文泥沙规律研究:英文》目录参见目录图

内容摘要
Xiaolangdi water conservancy project of the Yellow River is located in Xiaolangdi,Mengjin county,Luoyang city,Henan province,at the exit of the last Canyon in the middle reaches of the Yellow River to the north of Luoyang city,40 km away from Luoyang city in the south.Xiaolangdi Reservoir of the Yellow River is located in the lower part of the middle reaches of the Yellow River,130 km away from Sanmenxia water conservancy project on the top and 128 km away from Huayuankou,Zhengzhou,Henan Province on the bottom.
Xiaolangdi Reservoir of the Yellow River is a large-scale comprehensive water conservancy project on the main stream of the Yellow River,which integrates sediment reduction,flood control,ice prevention,water supply and irrigation,power generation,storage,clearing and discharge of muddy water,eliminating harm and promoting profit,and it is the key project for harnessing and developing the Yellow River.Xiaolangdi water conservancy project is one of the most complex water conservancy projects in the world,which has important strategic position,large-scale project,complex geological conditions,spe water and sediment conditions and strict application requirements.It is the most challenging project.The control drainage area above the dam site of the reservoir is 694200 km2,accounting for 92.3% of the Yellow River drainage area.The flood control standard of Huayuankou in the lower reaches of the Yellow River has been raised from once in 60 years to once in 1 000 years,which basically relieves the threat of ice flood in the lower reaches of the Yellow River and slows down the deposition of the lower reaches of the river.Xiaolangdi is the only control project under Sanmenxia,the main stream of the Yellow River,which can obtain large storage capacity.It is in the key position of connecting the upstream and the downstream to control the water and sediment volume.

   相关推荐   

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP