• 深埋长隧洞TBM施工组织设计关键技术(英文版)
21年品牌 40万+商家 超1.5亿件商品

深埋长隧洞TBM施工组织设计关键技术(英文版)

正版保障 假一赔十 可开发票

37.66 6.3折 60 全新

库存20件

广东广州
认证卖家担保交易快速发货售后保障

作者洪松,孙宝升著

出版社黄河水利出版社

ISBN9787550931848

出版时间2019-12

装帧平装

开本其他

定价60元

货号11677235

上书时间2024-12-26

灵感书店

三年老店
已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
商品描述
目录
"Translator′s Preface Preface Chapter 1  Layout and construction of TBM adit (1) 1. 1  Layout of TBM adit (1) 1. 2  Construction method of TBM adit (14) Chapter 2  TBM type selection (30) 2. 1  TBM types (30) 2. 2  Advantages and disadvantages of various types of TBM (35) 2. 3  TBM host selection principle (37) 2. 4  TBM host selection (38) 2. 5  Introduction of TBM under development (45) Chapter 3  TBM configuration (47) 3. 1  Open TBM configuration (47) 3. 2  Single shield TBM configuration (55) 3. 3  Double shield TBM configuration (58) 3. 4   DSU-C (62) Chapter 4  TBM assembly, stepping (sliding) and launching (63) 4. 1  TBM assembly (63) 4. 2  Concept of TBM stepping and sliding (69) 4. 3  TBM launching (71) Chapter 5  TBM construction of deep buried long tunnel (75) 5. 1  Tunnel TBM construction (75) 5. 2  Construction section of TBM through drilling and blasting method (86) 5. 3  Maintenance and disassembly of TBM (87) Chapter 6  TBM construction and transportation (90) 6. 1  TBM construction transportation object (90) 6. 2  Tunnel slag transportation (90) 6. 3  Material transportation (93) 6. 4  Train formation (96) 6. 5  Locomotive configuration (96) Chapter 7   Ventilation (100) 7. 1  Ventilation standard (100) 7. 2  Construction ventilation equipment (106) 7. 3  Calculation parameters and formulas of construction ventilation (111) 7. 4  Construction ventilation calculation (114) Chapter 8   Cooling (132) 8. 1  Ambient temperature in tunnel (132) 8. 2  Main heat sources for TBM construction of deep buried long tunnels (132) 8. 3  Calculation of heat in the tunnel (133) 8. 4  Cooling measures in tunnel (137) 8. 5  Cooling calculation model for TBM construction of deep buried long tunnel (137) Chapter 9   Drainage (148) 9. 1  Discharge forecast (148) 9. 2  Design of TBM construction drainage system (150) 9. 3  Water hammer calculation (155) 9. 4  Avoidance of water hammer (158) Chapter 10  Power supply (159) 10. 1  Main power load (159) 10. 2   Voltage (159) 10. 3  Construction power supply load estimation (160) Chapter 11  Construction management of precast concrete segment (164) 11. 1  Scale of precast concrete segment plant (164) 11. 2  Production process of precast concrete segment (166) 11. 3  Layout of precast concrete segment plant (167) Chapter 12  Countermeasures of TBM construction in unfavorable geological section (169) 12. 1  Main geological risks of deep buried long tunnels (169) 12. 2  Measures to deal with main geological risks of deep buried long tunnels (169) 12. 3  Stuck treatment measures (180) Chapter 13  Schedule of TBM construction (192) 13. 1  Scheduling principles (192) 13. 2  TBM drilling feeler (192) 13. 3  Other progress indicators (195) 13. 4  TBM construction schedule preparation (197) Reference (199) "

内容摘要
    This book systematically discusses some key technical problems in TBM construction planning of deep buried long tunnels. It not only shares the experience of practical work, but also introduces some new technologies and new achievements, to provide valuable information for readers.The book is divided into 13 chapters, including the layout of adits,TBM lectotype,configuration, assembly and departure, advancing,transportation, ventilation, cooling, drainage, power supply, precast concrete segment, solutions in unfavorable geological tunnel section and construction schedule for TBM construction.This book can be used as a reference for engineers and technicians in the field of underground engineering construction.

精彩内容
This book systematically discusses some key technical problems in TBM construction planning of deep buried long tunnels. It not only shares the experience of practical work, but also introduces some new technologies and new achievements, to provide valuable information for readers.The book is divided into 13 chapters, including the layout of adits,TBM lectotype,configuration, assembly and departure, advancing,transportation, ventilation, cooling, drainage, power supply, precast concrete segment, solutions in unfavorable geological tunnel section and construction schedule for TBM construction.This book can be used as a reference for engineers and technicians in the field of underground e\ngineering construction.

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP