• Installation methods of offshore oil-gas well conductor
21年品牌 40万+商家 超1.5亿件商品

Installation methods of offshore oil-gas well conductor

正版保障 假一赔十 可开发票

190.08 6.6折 288 全新

库存28件

广东广州
认证卖家担保交易快速发货售后保障

作者杨进

出版社中国科技出版传媒股份有限公司

ISBN9787030719454

出版时间2021-02

装帧精装

开本16开

定价288元

货号11788891

上书时间2024-09-01

灵感书店

三年老店
已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
商品描述
目录
1 Functions of the Oil-Gas Well Conductor and Wellhead Structure

 1.1 Functions of Oil-Gas Well Conductor

 1.1.1 Functions of Exploration Well Conductor

 1.1.2 Functions of Development Well Conductor

 1.2 Oil-Gas Wellhead Structure

 1.2.1 Conductor Structure of the Wellhead Above the Sea

 1.2.2 Conductor Structure of Subsea Wellhead

 1.3 Common Oil-Gas Wellhead Equipment

 1.3.1 Technical Requirements of Wellhead Equipment

 1.3.2 Common Wellhead Equipment

 References

2 Drilling-In Installation of Oil-Gas Well Conductor

 2.1 Drilling-In Installation of Conductor

 2.1.1 Drilling-In Construction Method of Conductor

 2.1.2 Conductor Construction Method for Wellhead Above the Sea

 2.1.3 Precautions for Construction

 2.2 Main Equipment

 2.2.1 Driving System

 2.2.2 Rotating System

 2.2.3 Hoisting System

 2.2.4 Wellhead and Downhole Tools

 2.3 Suitable Conductor Setting Depth Design

 2.3.1 Load Analysis of Oil-Gas Well Conductor

 2.3.2 Calculation Models of Conductor Bottom Ultimate Bearing Capacity

 2.3.3 Calculation Models of Conductors Lateral Friction of Oil-Gas Well Conductor

 2.3.4 Calculation of Suitable Conductor Setting Depth

 2.4 Application Case Analysis

 2.4.1 Oil Field Base Information

 2.4.2 Suitable Depth Below Mud Line Design of Oil-Gas Well Conductor

 2.4.3 Check Analysis of Conductor Stability

 References

3 Piling Installation of Oil-Gas Well Conductor

 3.1 Piling Installation Technology of Conductor

 3.1.1 Piling Construction Technology

 3.1.2 Precautions for Construction

 3.2 Main Equipments

 3.2.1 Piling Equipments

 3.2.2 Lifting Equipment

 3.2.3 Conductor Shoe

 3.3 Reasonable Setting Depth Design

 3.3.1 Load Analysis of Oil-Gas Well Conductor

 3.3.2 Calculation of Conductor Bottom Ultimate Bearing Capacity

 3.3.3 Calculation of Pile Driving Resistance

 3.3.4 Calculation of Conductor Setting Depth

 3.3.5 Calculation of Penetration Length

 3.3.6 Calculation Model of Hammering Number

 3.4 Application Case Study

 3.4.1 Basic Information of Oil Field

 3.4.2 Design of Depth of Conductor into Mud

 3.4.3 Check and Analysis of Conductor Stability

 3.4.4 Selection of Pile Hammer

 References

4 Jetting Installation Method of Oil-Gas Well Conductor

 4.1 Jetting Installation Method of Conductor

 4.1.1 Jetting Construction Method

 4.1.2 Precautions for Jetting Installation

 4.2 Main Equipment

 4.2.1 Driving System and Drill String

 4.2.2 CADA Tool

 4.3 Design of the Setting Depth of Conductor

 4.3.1 Load Analysis of the Conductor

 4.3.2 Calculation of Bearing Capacity of Conductor

 4.3.3 Calculation Method of the Setting Depth of Conductor

 4.4 Optimal Design of Jetting Installation of Conductor

 4.4.1 Optimal Design of Jetting Drilling Pressure

 4.4.2 Design of Jetting Displacement

 4.4.3 Design of Bit Protrusion

 4.4.4 Determination of Release Waiting Time-Window

 4.5 Application Case Analysis

 4.5.1 The Ultimate and Real-Time Bearing Capacity of Conductor

 4.5.2 Safe Depth of Conductor into Mud in Jetting InstallationMethod

 4.5.3 Safe Waiting Time of Surface Conductor

 References

5 Adaptability of Installation Method of Offshore Conductors

 5.1 Technical Adaptability of Drilling-In Installation Method of Conductor

 5.2 Technical Adaptability of Piling Installation Method of Conductor

 5.3 Technical Adaptability of Jetting-Down Installation Method of Conductor

精彩内容
本书的主要内容分为五章。第1章根据海上油气井导管的功能和作业环境,将海上油气井导管分为上井口和海底井口。本章介绍两种最常见的井口(即勘探和开发井)的导体主要部件和结构特征。此外,还讨论了全球使用的典型斜撑和袋装井口结构。第2-4章主要讨论海上油气井导管的三种主要安装方法(包括钻入安装、打桩安装和喷射安装)的施工技术和设备。本部分还详细介绍了这三种安装方法中的关键工程技术。第5章根据地质、海洋环境和施工作业等因素,分析了三种施工技术的差异和适用性,为海上油气井导管安装方法的选择提供科学依据。

   相关推荐   

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP