目录 Translator′s Preface Preface Chapter 1 Layout and construction of TBM adit 1.1 Layout of TBM adit 1.2 Construction method of TBM adit Chapter 2 TBM type selection 2.1 TBM types 2.2 Advantages and disadvantages of various types of TBM 2.3 TBM host selection principle 2.4 TBM host selection 2.5 Introduction of TBM under development Chapter 3 TBM configuration 3.1 Open TBM configuration 3.2 Single shield TBM configuration 3.3 Double shield TBM configuration 3.4 DSU-C Chapter 4 TBM assembly, stepping sliding and launching 4.1 TBM assembly 4.2 Concept of TBM stepping and sliding 4.3 TBM launching Chapter 5 TBM construction of deep buried long tunnel 5.1 Tunnel TBM construction 5.2 Construction section of TBM through drilling and blasting method 5.3 Maintenance and disassembly of TBM Chapter 6 TBM construction and transportation 6.1 TBM construction transportation object 6.2 Tunnel slag transportation 6.3 Material transportation 6.4 Train formation 6.5 Locomotive configuration Chapter 7Ventilation 7.1 Ventilation standard 7.2 Construction ventilation equipment 7.3 Calculation parameters and formulas of construction ventilation 7.4 Construction ventilation calculation Chapter 8 Cooling 8.1 Ambient temperature in tunnel 8.2 Main heat sources for TBM construction of deep buried long tunnels 8.3 Calculation of heat in the tunnel 8.4 Cooling measures in tunnel 8.5 Cooling calculation model for TBM construction of deep buried long tunnel Chapter 9 Drainage 9.1 Discharge forecast 9.2 Design of TBM construction drainage system Water hammer calculation 9.4 Avoidance of water hammer Chapter 10 Power supply 10.1 Main power load 10.2 Voltage 10.3 Construction power supply load estimation Chapter 11 Construction management of precast concrete segment 11.1 Scale of precast concrete segment plant 11.2 Production process of precast concrete segment 11.3 Layout of precast concrete segment plant Chapter 12 Countermeasures of TBM construction in unfavorable geologicalsection 12.1 Main geological risks of deep buried long tunnels 12.2 Measures to deal with main geological risks of deep buried long tunnels 12.3 Stuck treatment measures Chapter 13 Schedule of TBM construction 13.1 Scheduling principles 13.2 TBM drilling feeler 13.3 Other progress indicators 13.4 TBM construction schedule preparation 197Reference
内容摘要 This book systematically discusses some key technical problems in TBM construction planning of deep buried long tunnels. It not only shares the experience of practical work, but also introduces some new technologies and new achievements, to provide valuable information for readers.The book is divided into 13 chapters, including the layout of adits,TBM lectotype,configuration, assembly and departure, advancing,transportation, ventilation, cooling, drainage, power supply, precast concrete segment, solutions in unfavorable geological tunnel section and construction schedule for TBM construction.This book can be used as a reference for engineers and technicians in the field of underground engineering construction.
以下为对购买帮助不大的评价