• 石油测井工程技术中的标准操作程序(英文)/自然科学技术专著丛书
图书条目标准图
21年品牌 40万+商家 超1.5亿件商品

石油测井工程技术中的标准操作程序(英文)/自然科学技术专著丛书

全新正版未拆封

46.81 5.3折 89 全新

库存2件

湖南长沙
认证卖家担保交易快速发货售后保障

作者夏学锋、孙中原 著

出版社北京邮电大学出版社

出版时间2018-02

版次1

装帧平装

上书时间2023-07-07

A小二郎书舍A

四年老店
已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
图书标准信息
  • 作者 夏学锋、孙中原 著
  • 出版社 北京邮电大学出版社
  • 出版时间 2018-02
  • 版次 1
  • ISBN 9787563551323
  • 定价 89.00元
  • 装帧 平装
  • 开本 16开
  • 纸张 胶版纸
  • 页数 355页
【内容简介】
  This book aims to teach the Petroleum logging employees the standard operating procedure (SOP) in Petroleum Logging Engineering Technology. The book is divided into eleven chapters. The eleven chapters named, respectively, Openhole Wireline Logging SOP, Pipe conveyed logging SOP, Fishing Operation SOP, Vertical Seismic Profile SOP, Free Point Indicator SOP, Bridge Plug Setting SOP' Truck Preventive Maintenance 1 SOP' Truck Preventive Maintenance 2 SOP, Truck Preventive Maintenance 3 SOP, Wireline Converyed Perforating SOP and Tubing Conveyed Perforating SOE
  This book narrates the standard operating procedure (SOP) from the whole process of petroleum logging engineering in detail. It can be used as a guidance book in petroleum logging employees' work and would improve their operation standardization and security.
  This book also should attract the attention of the managers in petroleum Logging industry, both domestic and abroad. They could supervise their employees whether operate in a standard procedure and teach them what the correct procedure is.
  What's more, this book also could be used for the students, who prepare to engage in the industry work, as a self-study book in Petroleum University.
【作者简介】
  夏学锋,博士、高级工程师,石油勘探测井技术专家,从事石油勘探行业近二十年,先后在哈萨克斯坦、阿塞拜疆、阿联酋、阿曼等国家工作,具有丰富的现场施工和管理工作经验,先后参与了“海洋石油工程装备大数据”国家工程实验室建设、国家自然科学基金项目、中国科技项目管理专业委员会建设,获得十余项石油石化行业科学技术进步奖及管理创新成果奖,参与编写了石油工业出版社出版的测井专业技术论文集、中国商务出版社出版的人力资源管理实务,被列为高等教育“十三五”规划教材,在国外电子测量技术、中国石油石化等期刊发表专业学术论文二十余篇。
【目录】
Chapter 1  Openhole Wireline Logging SOP
1.1  Preparation at Bace
1.2  Mobilization
1.3  Preparation at Wellsite
1.4  Logging Operations
1.5  Post]obWellsite Procedure
1.6  Demobilization

Chapter 2 Pipe Conveyed Logging SOP
2.1  Preparation at Base
2.2  Mobilization
2.3  Preparation at Wellsite
2.4  Operations
2.5  Post lob Wellsite Procedure
2.6  Demobilization

Chapter 3 Fishing Operation SOP
3.1  Preparation at Base
3.2  Mobilization
3.3  Preparation at Wellsite
3.4  Operations
3.5  Post]ob Wellsite Procedure
3.6  Demobilization

Chapter 4 Vertical Seismic Profile SOP
4.1  Preparation at Base
4.2  Mobilization
4.3  Preparation atWellsite
4.4  Operations
4.5  Post Job Wellsite Procedure
4.6  Demobilization

Chapter 5 Free Point Indicator SOP
5.1  Preparation at Base
5.2  Mobilization
5.3  Preparation atWellsite
5.4  Operations
5.5  Post Job Wellsite Procedure
5.6  Demobilization

Chapter 6 Bridge Plug Setting SOP
6.1  Preparation at Base
6.2  Mobilization
6.3  Preparation atWellsite
6.4  Operations
6.5  Post Job Wellsite Procedure
6.6  Demobilization

Chapter 7 Truck Preventive Maintenance 1 SOP
7.1  Preliminary Inspection
7.2  Inspection Front of Cab
7.3  Inspection Left Side of Cab
7.4  Inspection Lower Left Side of Recorder Cab
7.5  Inspection Left Side Tandem Wheels Area
7.6  Inspection Right Side Tandem Wheels Area
7.7  Inspection Right Side of Cab
7.8  Inspection Under the Vehicle
7.9  Inspection Under the Cab Cover
7.10  Inspection Insidethe Cab
7.11  Inspection Lighting
7.12  Trouble Shooting

Chapter 8 Truck Preventive Maintenance 2 SOP
8.1  Driving Inspection
8.2  Stationary Inspection
8.3  Engine Compartment Inspection
8.4  Tire And Wheel Inspection
8.5  Battery Inspection
8.6  Under Vehicle Inspection
8.7  Body Inspection
8.8  Air Conditioner Inspection
8.9  Safety Equipment Inspection
8.10  Air Cleaner Inspection
8.11  Fuel System Inspection
8.12  Auxiliary Generator Inspection
8.13  Hydraulic Inspection
8.14  Generator Inspection

Chapter 9 Truck Preventive Maintenance 3 SOP
9.1  Driving Inspection
9.2  Stationary Inspection
9.3  Engine Compartment Inspection
9.4  Tire And Wheel Inspection
9.5  Battery Inspection
9.6  Under Vehicle Inspection
9.7  Body Inspection
9.8  Air Conditioner Inspection
9.9  Safety Equipment Inspection
9.10  Air Cleaner Inspection
9.11  Raise Front End Inspection
9.12  Lubrication Inspection
9.13  Fuel System Inspection
9.14  Auxiliary Generator Inspection
9.15  Hydraulic Inspection
9.16  AT-355/aubum Transmission Inspection
9.17  Draw Works
9.18  Generator Inspection

Chapter 10 Wireline Conveyed Perforating SOP
10.1  Preparation at Base
10.2  Mobilization
10.3  Preparation at Wellsite
10.4  Operations
10.5  Post Job Wellsite Procedure
10.6  Demobilization

Chapter 11  Tubing Conveyed Perforating SOP
11.1  Preparation at Base
11.2  Mobilization
11.3  Preparation at Wellsite
11.4  Operations
11.5  Post Job Wellsite Procedure
11.6  Demobilization

Appendix 1  Depth Control Policy
Appendix 2  CNLC Fishing Policy
Appendix 3  Prevention of Sticking
Appendix 4  Quick Splice Instructions
Appendix 5  Square Knot (Reef Knot)
Appendix 6  Reverse Cut and Thread
Appendix 7  Crane Operation
Appendix 8  Wellhead Voltage Levels
Appendix 9  Radio Silence
Appendix 10  Power Shutdown
Appendix 11  TCP String
Appendix 12  Torque for Threaded Connections
点击展开 点击收起

   相关推荐   

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP