• 铁路路基填筑工程连续压实控制技术规程Q\\CR9210-2015(英文版)
图书条目标准图
21年品牌 40万+商家 超1.5亿件商品

铁路路基填筑工程连续压实控制技术规程Q\\CR9210-2015(英文版)

Technical Specification for Continuous Compaction Control of Railway Subgrade(铁路路基填筑工程连续压实控制技术规程(Q/CR 9210-2015)) 3G11a 版次更新不同步 以实际收到书为准

300 全新

库存3件

北京通州
认证卖家担保交易快速发货售后保障

作者CR 9210-2015 : 英文

出版社中国铁道出版社

出版时间2017-01

版次1

装帧平装

上书时间2023-07-11

中国工程定额书店

七年老店
已实名 已认证 进店 收藏店铺

   商品详情   

品相描述:全新
图书标准信息
  • 作者 CR 9210-2015 : 英文
  • 出版社 中国铁道出版社
  • 出版时间 2017-01
  • 版次 1
  • ISBN 9787113226756
  • 定价 300.00元
  • 装帧 平装
  • 开本 16开
  • 纸张 胶版纸
  • 页数 25页
【内容简介】
¡¡¡¡This Specification consists of 6 chapters£¬namely General Provisions£¬Terms and Symbols£¬ Basic Requirements£¬Correlation Test£¬Continuous Compaction Control and Compaction Quality Report and 4 appendices.
¡¡¡¡The mam revisions in this Specification include the following£º
¡¡¡¡1.The definitions of superposition compaction and sequence compaction were added and the requirements for the number of rolling passes were specified
¡¡¡¡2.The contents of compaction information management were supplemented and improved£¬and the technical requirements for vibratory rollers were modified
¡¡¡¡3.The requirements for the contents of correlation test were supplemented and improved.
¡¡¡¡4.The results to be submitted for compaction process control and the format of archiving report on compaction process were added.
¡¡¡¡5.The requirements for the contents of compaction information transmission were added.
¡¡¡¡All relevant organizations are kindly requested to summarize experience and collect data in the implementation of this Specification in their engineering practice.In case that any modification and] or supplementation is needed£¬please send the suggestions and relevant data to Southwest Jiaotong University £¨No.111£¬Northern 1st Section£¬2 Ring Road£¬Chengdu City£¬Postal Code£º610031£© and Economic and Planning Research Institute of Ministry of Railways £¨29B£¬Beifengwo Road£¬Haidian District£¬Beijing£¬Postal Code£º100038£© for future revision.
¡¡¡¡The Construction Management Department of CHINA RAILWAY is responsible for the explanation of this Specification.
【目录】
1 General Provisions
2 Terms and Symbols
2£®1 Terms
2£®2 Symbols
3 Basic Requirements
3£®1 GeneralRequirements
3£®2 Loading Equipment
3£®3 Testing Equipment
3£®4 InformationManagement
3£®5 Work Process
4 Correlation Test
4£®1 GeneralRequirements
4£®2 Field Operation
4£®3 Data Calculation
4£®4 Test Results
5 Continuous Compaction Control
5£®1 GeneralRequirements
5£®2 Field Operation
5£®3 Process Control
5£®4 Quality Inspection
6 Compaction Quality Report
Appendix A Correlation Test Report
Appendix B Archiving Report on Compaction Process
Appendix C Distribution Diagram of Compaction State
Appendix D Distribution Diagram of Compaction Degree
Words Used for Different Degrees of Strictness
点击展开 点击收起

—  没有更多了  —

以下为对购买帮助不大的评价

此功能需要访问孔网APP才能使用
暂时不用
打开孔网APP